
When production cannot afford to stop
Precision industrial maintenance for the most demanding plants in Albacete, Madrid and Valencia. Senior engineers and electromechanics with projects across three countries.
One provider for all your plant engineering needs
Industries that cannot afford a stoppage
Why Orca Industry
Guaranteed SLA
Technician on-site in under 2 hours in Castilla-La Mancha. Contractually guaranteed.
In-House Team
No subcontractors. Our own engineers and electromechanics, with our standards.
European Experience
10 years of projects in Belgium and France. That same rigour, now in Spain.
Regional Coverage
HQ in Cuenca. Operational in Albacete, Madrid and Valencia in under 2 hours.
Results that speak for themselves
Real projects. Real data.

14 unplanned annual stoppages on sorting line. Cost per stoppage: €12,000–€25,000.

2 weekly stoppages on packaging line. Constant product losses and delivery delays.

New plant with no maintenance plan. Corrective cost over budget from month one.
Coverage across the industrial triangle of central-eastern Spain
HQ in Cuenca. Operational radius covering the three largest industrial hubs in the region.
Technical knowledge for production directors
Preventive vs corrective maintenance: which does your plant need?
Find out when to prioritise preventive maintenance over corrective based on machinery type, sector, and the real cost of downtime in your industrial plant.
What a production stoppage really costs in a logistics plant
We calculate the true cost of one hour of downtime in a logistics and parcels plant: lost production, overtime, SLA penalties and reputational damage.
Automation in the food industry: what to automate first and why
A practical guide for production directors in the food industry: which lines or processes to automate first to maximise return in the shortest possible time.
How much does one hour of production downtime cost you?
Request a free plant diagnostic. We'll show you how to reduce that cost.