Logistics & Parcels

A stopped conveyor at Christmas can cost €50,000. We prevent that from happening.

Industrial maintenance in logistics and parcels allows no improvisation. Peak seasons, client SLAs and continuous operation: your infrastructure must be perfect.

Sector challenges

Conveyor belts and sorters

Failures in sorters, flat or inclined belts and automatic sorting systems that halt dispatch.

AGVs and guided carts

Breakdowns in autonomous vehicles that block critical internal movement routes.

Loading docks

Issues with levellers, sectional doors and mooring systems that interrupt inbound and outbound flow.

Peak season without margin

Black Friday, Christmas, e-commerce peaks: the system cannot fail when it's most needed.

How Orca Industry responds

We design preventive maintenance plans adapted to your operational seasons. We guarantee emergency response in under 2 hours for any critical breakdown at your plant.

Real case study

Logistics company · Belgium

Problema

14 unplanned stoppages per year on the sorting line. Each stoppage: 3 to 8 hours out of service.

Solución

Bi-annual preventive plan + critical parts stock on-site + 90-min response protocol.

Resultado

0 unplanned stoppages in 18 months. Estimated saving: €180,000.

A stopped conveyor at Christmas can cost €50,000. We prevent that from happening.

Industrial maintenance in logistics and parcels allows no improvisation. Peak seasons, client SLAs and continuous operation: your infrastructure must be perfect.

Speak with a specialist