Contact

How much does one hour of production downtime cost you?

Request a free plant diagnostic. We'll show you how to reduce that cost.

Direct contact

Headquarters
Cuenca, Spain
Operating in Albacete · Madrid · Valencia
Guaranteed response

We respond within 24 business hours. For emergencies, WhatsApp.

Real cases

Verifiable results, no empty marketing

A selection of recent projects. No names for confidentiality. With verifiable data.

Logistics & Parcels

Postal sortation hub — East Flanders

Problem

14 unplanned conveyor stops during the Q4-2023 Black Friday peak. Risk of losing a key logistics contract.

Solution

Full mechanical audit, predictive sensors on critical motors, and CMMS with quarterly lubrication plans.

Result

99,4 %Conveyor uptime in Q4-2024
BE2024
Logistics & Parcels

Distribution warehouse — Valencia metropolitan area

Problem

Motorised rollers failed every 14 days due to bearing overheating. Annual cost: €28,000 in parts and downtime.

Solution

Thermal diagnosis, lubrication plan redesign with specific grease, and per-shift vibration monitoring.

Result

× 12MTBF from 14 days to 6 months
ES2024
Food Industry

Frozen food producer — Antwerp

Problem

Ammonia compressor with unplanned stops twice a month. Risk of cold chain failure on €180,000 of stock.

Solution

Preventive compressor overhaul, continuous pressure and temperature monitoring, and condition-based maintenance.

Result

11months without an unplanned stop
BE2024